
OCN Level 2 · Workshop Skills & Sustainable Manufacturing
Days 16–20 of 30 · Module 2Lessons 16–20
Frame Finishing
Clean · design · prep · spray · varnish — make it yours
Welcome the room. Say the day's shape in one sentence.
Recap · whole group
No hands needed · take your time
What do you remember from the frame build?
1What does Lug mean?
2What does Mitering mean?
3What does Dry fit mean?
Say itAnswer out loud. Any answer is a start.
Ask, then count ten before taking an answer. Take offers, never cold call.
How today runs
Run of day
Every step is one of four→Show it→Build it→Say it→Show me
4 hrsDay 16 · Frame Removal & Cleaning
4 hrsDay 17 · Design Planning
4 hrsDay 18 · Surface Preparation
4 hrsDay 19 · Frame Spraying
4 hrsDay 20 · Protective Finishing
Read the shape of the day out loud once. Say when the break falls.
For the instructor
Videos today
- 1Finishing the frame OmKp2ZHcMVoToday
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Check every file is on the laptop before the session. Subtitles are on.
Non-negotiable · every session
Safety first
- FFP2 mask (EN 149) in the spray area on Day 19 — no exceptions. Day 20 varnish is brush only, never sprayed
- Ventilation on before spraying; one learner sprays at a time, about 10–20 minutes each in total
- Water-based finishes only — no solvents; no naked flames
- Aerosols issued by the tutor and returned at the end; rags disposed of safely
Read every rule aloud. Same list as the session risk assessment. Also read out: tool count at the start and end; craft knives and scrapers are high-security (numbered, signed in and out); safety glasses on; cut-resistant gloves (EN 388 Level D/5) for sanding, scraping and cutting; no food or drink, wash hands after every finishing session; spray PPE is an FFP2 mask, nitrile gloves, safety glasses and long-sleeved overalls. Day 20 varnish is MTN Mural, brushed on only, never sprayed, whatever a film shows: nitrile gloves, safety glasses, ventilation on, about 15–30 minutes of brush contact per learner in total. Allow proper drying time between coats.
Show it
Recap · last lesson
What you did last time
- 1You bonded a whole frame
- 2Set the jig and passed QC
- 3A frame that's cured and aligned

One idea per bullet. Say it, then show it.
Show it▶How to Decorate a Bamboo Bike Frame (Make It Your Own)Watch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Say it
Words for today · 1 of 2
Key terms

- Flash time
- The wait between coats — liquid gone, but not fully cured
- Orange peel
- A bumpy finish defect from spraying too thick or close
- Tack cloth
- A sticky cloth that lifts dust off before painting
Words before content. Same word on the slide, the worksheet and out loud.
Say it
Words for today · 2 of 2
More key words
- Varnish
- The clear protective coat applied last, brushed on
- Adhesion test
- A fingernail scratch on a test piece to check the finish has bonded
- Curing vs drying
- Drying = surface set; curing = fully hard
Second half. Ask for each word back in their own words.
Week 4 of 6 · 5 days · 20 hours
From bare frame to finished bike
16
Day 16
Remove & clean
17
Day 17
Design the finish
18
Day 18
Prep the surface
19
Day 19
Spray the frame
20
Day 20
Varnish & detail
⚑
You make
A painted, varnished frame
Four hours a day. The finish is what everyone sees first — so the standard is high.
Keep it moving.
Build it
Day 16 · strip & clean
Off the jig, cleaned up
- Remove the frame from the jig safely — only after a full 24 hours; if that is not until later in the day, start with the other tasks first
- Scrape or sand off cured epoxy without damaging the bamboo (safety glasses and FFP2 mask) and cut-resistant gloves (EN 388 Level D/5) — no solvents
- Inspect every joint before you go further

One idea per bullet. Say it, then show it. Cleaning is demo + supervised — show the technique first. Hardware faces: clean, grease, seat.
Show it▶Inspiration #2 Feather LayeringWatch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Build it
Days 17–18 · design & prep
Plan it, then prep it
- Plan colour, layout, stencils — the plan is evidence
- Sand through progressive grits — coarse to fine
- Test the finish on a sample; tack-cloth the dust

One idea per bullet. Say it, then show it. Design opens with mood boards and examples. For the sanding: FFP2 dust mask and cut-resistant gloves (EN 388 Level D/5), with dust extraction on. Masking stencils cut from acetate or card; frames covered, ready for Day 19.
Show it▶Inspiration #4 Masking and LayeringWatch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Build it
Days 19–20 · spray & varnish
Thin, even coats
- Spray in thin even coats — mind the flash time between them
- Spraying too thick or too close gives orange peel
- Finish with varnish, brushed on (never sprayed), for a professional, protected frame

One idea per bullet. Say it, then show it. Spray setup: booth, mask, ventilation — no exceptions. Teach application technique before anyone sprays; frames stored to cure. Day 20: varnish is brushed on, never sprayed; coats and drying times follow the product label.
Show it▶Introducing Spray.BikeWatch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Show it▶Finishing the frameWatch together · pause at each stage
Play from the laptop if the room has no internet. Ask the slide's question after.
Film library · 1 of 2
Lesson videos
Finishing & prep
- Finishing the frameBamboo Bicycle Club — finishing and fitting
- Introducing Spray.BikeThe Spray.Bike paint system explained
- Spray.Bike: masking & layeringInspiration — masking and layering colours
Paint & finish ideas
- Spray.Bike: snakeskin BMXInspiration — a snakeskin paint finish
- Spray.Bike: feather layeringInspiration — a feathered paint effect
- Custom paint a bike like a proGCN — a custom paint job, step by step
The reference list - the Videos today slide is the running order.
The reference list - the Videos today slide is the running order.
Show it▶My Top 5 Restorations of 2019Watch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Film library · 2 of 2
Lesson videos
Paint & finish ideas
- Restoration inspirationFinish ideas from five bike restorations
- Bamboo frame decorationBamboo Bicycle Club — decorating a bamboo frame
The reference list - the Videos today slide is the running order.
The reference list - the Videos today slide is the running order.
We do · together
Spot the defect
- Together, find orange peel on a sample
- Spot a run or sag
- Say what caused each

Build itInspect a sprayed sample together; name each defect and how to avoid it.
Offer to scribe at every written task. A scribed verbal answer is valid evidence.
Show it▶How To Custom Paint A Bike Like A Pro With Some Help FromWatch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Show it▶Inspiration #3 Snakeskin BMXWatch for the technique — pause and repeat it at the bench
One clip, one slide — play from the deck. No internet in the room: use the archive file.
Show me
Stop — record evidence
Hand these in
Days 16–20 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO2–LO5, today.
Hard stop. Signing happens in the room. File before anyone leaves. Full mapping: Goes in your OCN portfolio LO2 (design), LO3 (surface prep), LO4 (spraying), LO5 (protective finishing) , today.

Show it
Days 16–20 · wrap-up
What did we do today?
- Cleaned and prepped the bare frame
- Designed, sprayed and varnished your finish
- A frame you can be proud of
Next lesson: fitting the components — the frame becomes a bike.
Mirror the objectives back. Two words of specific praise per learner.
Show it
Next session · looking ahead
Next: fit the components
- Fork, cockpit and drivetrain
- Brakes and wheels
- The frame becomes a bike

One idea per bullet. Say it, then show it.