Building the Bamboo Frame
OCN Level 2 · Workshop Skills & Sustainable Manufacturing
Days 11–15 of 30 · Module 2

Lessons 11–15
Frame Building – Gravel Lugged Bamboo Frame Construction

Select · shape · fit · jig · bond — the gravel lugged build

Recap · whole group
No hands needed · take your time
What do you remember from Day 10?
1What does Market segment mean?
2What does Specification mean?
3What does Overheads mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build2 / 21
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
4 hrsDay 11 · Design Analysis & Material Selection
4 hrsDay 12 · Front Triangle Shaping Part 1
4 hrsDay 13 · Front Completion + Rear Begin
4 hrsDay 14 · Rear Triangle Completion + Full Frame
4 hrsDay 15 · Frame Bonding & Final Assembly
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build3 / 21
For the instructor

Videos today

  • 1Building a bamboo bike frame ckCwJXJGKD0Today
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build4 / 21
Non-negotiable · every session

Safety first

  • Saws & knives: high-security, numbered, signed in and out. Blade away from your body, every pass
  • Safety glasses on before any blade; FFP2 masks for cutting & sanding; cut-resistant gloves (EN 388 Level D/5) for cutting, filing & sanding; extraction on first
  • Epoxy: your instructor dispenses it. Never handle resin or hardener. Gloves on, work ventilated
  • Epoxy on you? Eyes: eye wash for at least 15 minutes. Skin: soap and water
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build5 / 21
Show it
Recap · last lesson

What you did last time

  • 1The bike's four systems
  • 2Why bamboo suits a frame
  • 3What a frame's geometry means
Gold bamboo city bike, side view
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build6 / 21
Say it
Words for today · 1 of 2

Key terms

Full bike kit laid out flat
Lug
The metal sleeve that joins two bamboo tubes
Mitering
Shaping a tube end to fit cleanly against another
Dry fit
Assembling without glue to check fit and alignment
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build7 / 21
Say it
Words for today · 2 of 2

More key words

Jig
The fixture that holds the frame aligned while glue cures
Working time
How long you have to position a joint after your instructor dispenses the epoxy (2–5 minutes)
Dropout
The fitting at the rear where the wheel axle attaches
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build8 / 21
Week 3 of 6 · 5 days · 20 hours

From poles to a bonded frame

11
Day 11
Select bamboo
12
Day 12
Shape the front
13
Day 13
Finish front, start rear
14
Day 14
Rear & dry-fit
15
Day 15
Bond & align
⚑
You make
A bonded frame
Four hours a day. Every day opens with a tool count and safety brief.
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build9 / 21
Build it
Day 11 · material selection

Choose good bamboo

  • Check each tube against the selection criteria — diameter, wall thickness, nodes, no cracks
  • Reject any cracked tube — splits splinter
  • Match diameter and wall thickness to the spec
Bamboo tubes with kit parts and cardboard packaging
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build10 / 21
Build it
Days 12–13 · shaping

Shape the ends to fit

  • Miter each tube end to sit cleanly against the lug
  • Black marks show where to file back
  • Aim for an easy fit — snug, but loose enough for glue
Filing a bamboo tube to the line
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build11 / 21
Show it
How the frame joins

The lugged joint

  • A lug is a metal sleeve that joins two tubes
  • The shaped bamboo bonds inside the lug
  • Every joint zone is filed, wiped dry, then glued
Bamboo tubes seated in a black frame lug — the socket joint
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build12 / 21
Build it
Day 14 · dry assembly

Dry-fit & set the jig

  • Assemble the whole frame without glue
  • Fix it in the jig and check alignment
  • Run the QC checklist before any epoxy
Frame hanging in the spray booth
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build13 / 21
Build it
Day 15 · bonding — the critical day

Position, bond & align

  • Your instructor dispenses the epoxy. You never handle the resin or hardener. Position the joint within 2–5 minutes
  • Ventilation on. You wear nitrile gloves, safety glasses and long-sleeved overalls
  • Bond joints in the correct sequence
  • Re-check alignment in the jig. It cures for at least 24 hours before de-jigging
Gloved hands bonding a bamboo joint with epoxy
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build14 / 21
Show it▶Building a bamboo bike frameWatch together · pause at each stage
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build15 / 21
We do · together

The dry-fit check, together

  • Run the QC checklist aloud
  • Confirm alignment in the jig
  • Agree it's ready before any glue
Bamboo tube seated inside a frame lug
Build itRun the dry-fit checklist aloud — agree it is aligned before bonding.
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build16 / 21
Build it
Day 12 · front triangle

The shaping loop

  • Test fit the joint against the lug
  • Sand where it binds
  • Re-fit — repeat until it seats clean
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build17 / 21
Build it
Day 13 · keep momentum

Front done, rear begins

  • Start by addressing overnight reflections
  • Complete the front triangle joints
  • Rear triangle starts once the front seats true
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build18 / 21
Show me
Stop — record evidence

Hand these in

Days 11–15 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO3–LO6, today.
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build19 / 21
What did we do today?
Show it
Days 11–15 · wrap-up

What did we do today?

  • Selected, shaped and fitted every tube
  • Set the jig and passed the QC checklist
  • Bonded the frame — cured and aligned

Next lesson: finishing — sanding, spraying and the brushed-on varnish.

Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build20 / 21
Show it
Next session · looking ahead

Next: the finish

  • Clean the bare frame
  • Design your colours
  • Spray and varnish
Cleaned bamboo frame ready for finishing
Bamboo Bicycle ClubOCN Level 2Core workbookLessons 11–15 · Frame Build21 / 21