
OCN Level 2 · Workshop Skills & Sustainable Manufacturing
Days 11–15 of 30 · Module 2Lessons 11–15
Frame Building – Gravel Lugged Bamboo Frame Construction
Select · shape · fit · jig · bond — the gravel lugged build
Welcome the room. Say the day's shape in one sentence.
Recap · whole group
No hands needed · take your time
What do you remember from Day 10?
1What does Market segment mean?
2What does Specification mean?
3What does Overheads mean?
Say itAnswer out loud. Any answer is a start.
Ask, then count ten before taking an answer. Take offers, never cold call.
How today runs
Run of day
Every step is one of four→Show it→Build it→Say it→Show me
4 hrsDay 11 · Design Analysis & Material Selection
4 hrsDay 12 · Front Triangle Shaping Part 1
4 hrsDay 13 · Front Completion + Rear Begin
4 hrsDay 14 · Rear Triangle Completion + Full Frame
4 hrsDay 15 · Frame Bonding & Final Assembly
Read the shape of the day out loud once. Say when the break falls.
For the instructor
Videos today
- 1Building a bamboo bike frame ckCwJXJGKD0Today
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Check every file is on the laptop before the session. Subtitles are on.
Non-negotiable · every session
Safety first
- Saws & knives: high-security, numbered, signed in and out. Blade away from your body, every pass
- Safety glasses on before any blade; FFP2 masks for cutting & sanding; cut-resistant gloves (EN 388 Level D/5) for cutting, filing & sanding; extraction on first
- Epoxy: your instructor dispenses it. Never handle resin or hardener. Gloves on, work ventilated
- Epoxy on you? Eyes: eye wash for at least 15 minutes. Skin: soap and water
Read every rule aloud. Same list as the lesson Safety Reminders. One person cutting per station; the tutor checks the mark-out first. The hardener is corrosive; learners never handle resin or hardener. Ventilation on before dispensing. The instructor wears Cat III chemical-resistant nitrile gloves (EN 374), an EN 166 face shield and overalls to dispense. Eyes: after the eye wash, medical help at once. Fire: stop, tools down, follow the instructor to the muster point. Spill: the instructor absorbs it with sand or inert absorbent. Eye wash and shower within about 6 m. Also read out: tool count at the start and end; cutting stations 1.5 m apart; no food or drink, wash hands after glue work; de-jig only after a full 24 hours.
Show it
Recap · last lesson
What you did last time
- 1The bike's four systems
- 2Why bamboo suits a frame
- 3What a frame's geometry means

One idea per bullet. Say it, then show it.
Say it
Words for today · 1 of 2
Key terms

- Lug
- The metal sleeve that joins two bamboo tubes
- Mitering
- Shaping a tube end to fit cleanly against another
- Dry fit
- Assembling without glue to check fit and alignment
Words before content. Same word on the slide, the worksheet and out loud.
Say it
Words for today · 2 of 2
More key words
- Jig
- The fixture that holds the frame aligned while glue cures
- Working time
- How long you have to position a joint after your instructor dispenses the epoxy (2–5 minutes)
- Dropout
- The fitting at the rear where the wheel axle attaches
Second half. Ask for each word back in their own words.
Week 3 of 6 · 5 days · 20 hours
From poles to a bonded frame
11
Day 11
Select bamboo
12
Day 12
Shape the front
13
Day 13
Finish front, start rear
14
Day 14
Rear & dry-fit
15
Day 15
Bond & align
⚑
You make
A bonded frame
Four hours a day. Every day opens with a tool count and safety brief.
Keep it moving.
Build it
Day 11 · material selection
Choose good bamboo
- Check each tube against the selection criteria — diameter, wall thickness, nodes, no cracks
- Reject any cracked tube — splits splinter
- Match diameter and wall thickness to the spec

One idea per bullet. Say it, then show it. Open with the inspection technique demo — show the technique, then supervised practice.
Build it
Days 12–13 · shaping
Shape the ends to fit
- Miter each tube end to sit cleanly against the lug
- Black marks show where to file back
- Aim for an easy fit — snug, but loose enough for glue

One idea per bullet. Say it, then show it.
Show it
How the frame joins
The lugged joint
- A lug is a metal sleeve that joins two tubes
- The shaped bamboo bonds inside the lug
- Every joint zone is filed, wiped dry, then glued

One idea per bullet. Say it, then show it.
Build it
Day 14 · dry assembly
Dry-fit & set the jig
- Assemble the whole frame without glue
- Fix it in the jig and check alignment
- Run the QC checklist before any epoxy

One idea per bullet. Say it, then show it. Verification is vertical + horizontal — both planes must check true before any epoxy.
Build it
Day 15 · bonding — the critical day
Position, bond & align
- Your instructor dispenses the epoxy. You never handle the resin or hardener. Position the joint within 2–5 minutes
- Ventilation on. You wear nitrile gloves, safety glasses and long-sleeved overalls
- Bond joints in the correct sequence
- Re-check alignment in the jig. It cures for at least 24 hours before de-jigging

One idea per bullet. Say it, then show it. Ventilation on before the instructor dispenses; the instructor wears Cat III chemical-resistant nitrile gloves (EN 374), an EN 166 face shield and overalls. Demo first, then supervised wiping — wipe excess epoxy off with a dry, lint-free cloth before it cures. De-jig only after a full 24 hours; if that is not until later in the day, start with the other tasks first.
Show it▶Building a bamboo bike frameWatch together · pause at each stage
Play from the laptop if the room has no internet. Ask the slide's question after.
We do · together
The dry-fit check, together
- Run the QC checklist aloud
- Confirm alignment in the jig
- Agree it's ready before any glue

Build itRun the dry-fit checklist aloud — agree it is aligned before bonding.
Offer to scribe at every written task. A scribed verbal answer is valid evidence.
Build it
Day 12 · front triangle
The shaping loop
- Test fit the joint against the lug
- Sand where it binds
- Re-fit — repeat until it seats clean
Plan Day 12: front triangle shaping part 1. The test-fit / sand / re-fit cycle is the day's craft — no forcing, no gaps.
Build it
Day 13 · keep momentum
Front done, rear begins
- Start by addressing overnight reflections
- Complete the front triangle joints
- Rear triangle starts once the front seats true
Plan Day 13: open with the reflection round from Day 12's close; end with reflect-on-Day-13. The rhythm holds the week together.
Show me
Stop — record evidence
Hand these in
Days 11–15 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO3–LO6, today.
Hard stop. Signing happens in the room. File before anyone leaves. Full mapping: Goes in your OCN portfolio LO3 (shape & cut), LO4 (jig & alignment), LO5 (bonding), LO6 (finish quality) , today.

Show it
Days 11–15 · wrap-up
What did we do today?
- Selected, shaped and fitted every tube
- Set the jig and passed the QC checklist
- Bonded the frame — cured and aligned
Next lesson: finishing — sanding, spraying and the brushed-on varnish.
Mirror the objectives back. Two words of specific praise per learner.
Show it
Next session · looking ahead
Next: the finish
- Clean the bare frame
- Design your colours
- Spray and varnish

One idea per bullet. Say it, then show it.