De-Jig, Inspect, Sand & Paint
Build to Bond
Day 8 of 15 · Finishing

Day 8
De-Jig, Inspect, Sand & Paint

The day the frame starts to look like a finished bike

Recap · whole group
No hands needed · take your time
What do you remember from Day 7?
1What does PVA wood glue mean?
2What does Open time mean?
3What does Keying mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint2 / 18
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
20 minTool count, frame reveal
40 minDe-jig — supervised, only after 24 hours
30 minStructural inspection per learner
Break15 minutes
75 minV14 video, sanding demo
55 minMask off frame
30 minRemove tape promptly
35 minWorkbook + evidence
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint3 / 18
For the instructor

Videos today

  • 1De-jig & testing the bond 04a-dejig-test-bond.mp4Today
  • 2Masking off & surface preparation 04b-masking-surface-prep.mp4Watch in order
  • 3Painting the frame 04c-painting.mp4Watch in order
  • 4Protective clear coat 04d-protective-clear-coat.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint4 / 18
Non-negotiable · every session

Safety first

  • FFP2 mask for sanding (bamboo dust); FFP2 mask (EN 149) for spraying — no exceptions
  • Ventilation on before spraying; dust extraction on for sanding; cut-resistant gloves (EN 388 Level D/5) for sanding and scraping
  • Water-based products only; no naked flames in the spray area
  • Aerosols issued and returned by the tutor; one learner sprays at a time, about 10–20 minutes of spraying each in total
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint5 / 18
Say it
Words for today · 1 of 2

Key terms

De-jig
Removing the dried frame from the jig
Dryness test
Pressing the sample PVA blob — it shouldn't dent
Progressive sanding
Through grits 80 → 120 → 180 → 240
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint6 / 18
Say it
Words for today · 2 of 2

More key words

Mask off
Covering the areas you don't want painted
Flash time
The wait between coats while the paint dries
Clear coat
The transparent protective layer over the paint, brushed on (never sprayed)
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint7 / 18
Show it
Today · you will

What will we do today?

  • 1De-jig and test the bond
  • 2Sand through the grits
  • 3Mask, paint and clear coat
Gloved hands taping a bamboo tube
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint8 / 18
Show it▶Protective clear coatWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint9 / 18
Show it▶De-jig & testing the bondWatch together · the exact clip for today
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint10 / 18
Show it
De-jig, sand, paint

Sound, smooth, then coloured

  • Dryness test the PVA blob; de-jig only after a full 24 hours; scrape drips with the back of the knife
  • Sand lugs only (80→120); mask the bamboo
  • Paint lugs thin; brush clear coat on everything
Frame hanging in the spray booth
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint11 / 18
You do · your evidence

De-jig, sand & paint

  • Confirm dry; de-jig only after a full 24 hours (other tasks first if it is not yet 24 hours)
  • Sand the lugs (80→120); mask the bamboo
  • Paint lugs, clear coat; fix one defect before the final coat
Bamboo tubes and hand tools laid over the balance-bike drawing
Build itYour painted, clear-coated frame — bamboo natural — is today's evidence.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint12 / 18
Break
Break · 15 min
Back in the workshop after the count.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint13 / 18
Show it▶Painting the frameWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint14 / 18
Show it▶Masking off & surface preparationWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint15 / 18
Show me
Stop — record evidence

Hand these in

Day 8 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO6 (finishing), today.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint16 / 18
What did we do today?
Show it
Wrap-up · next

What did we do today?

  • De-jigged and inspected the frame
  • Sanded through the grits
  • Painted and clear-coated it

Next lesson: assembly and the final safety checks.

Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 8 · De-Jig, Inspect, Sand & Paint17 / 18
Show it
Next session · looking ahead

Next lesson: Assembly & Final Safety Checks

  • Fit wheels, handlebar, saddle
  • Hand-start every bolt
  • Pass the BBC Final Safety Inspection
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 76–87Day 8 · De-Jig, Inspect, Sand & Paint18 / 18