
Build to Bond
Day 8 of 15 · FinishingDay 8
De-Jig, Inspect, Sand & Paint
The day the frame starts to look like a finished bike
Welcome the room. Say the day's shape in one sentence.
Recap · whole group
No hands needed · take your time
What do you remember from Day 7?
1What does PVA wood glue mean?
2What does Open time mean?
3What does Keying mean?
Say itAnswer out loud. Any answer is a start.
Ask, then count ten before taking an answer. Take offers, never cold call.
How today runs
Run of day
Every step is one of four→Show it→Build it→Say it→Show me
20 minTool count, frame reveal
40 minDe-jig — supervised, only after 24 hours
30 minStructural inspection per learner
Break15 minutes
75 minV14 video, sanding demo
55 minMask off frame
30 minRemove tape promptly
35 minWorkbook + evidence
Read the shape of the day out loud once. Say when the break falls.
For the instructor
Videos today
- 1De-jig & testing the bond 04a-dejig-test-bond.mp4Today
- 2Masking off & surface preparation 04b-masking-surface-prep.mp4Watch in order
- 3Painting the frame 04c-painting.mp4Watch in order
- 4Protective clear coat 04d-protective-clear-coat.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Check every file is on the laptop before the session. Subtitles are on.
Non-negotiable · every session
Safety first
- FFP2 mask for sanding (bamboo dust); FFP2 mask (EN 149) for spraying — no exceptions
- Ventilation on before spraying; dust extraction on for sanding; cut-resistant gloves (EN 388 Level D/5) for sanding and scraping
- Water-based products only; no naked flames in the spray area
- Aerosols issued and returned by the tutor; one learner sprays at a time, about 10–20 minutes of spraying each in total
Read every rule aloud. Same list as the session risk assessment. Spray mist breathed in: fresh air, medical attention if symptoms continue. Paint in the eyes: rinse for at least 15 minutes and get medical attention. The clear coat is brushed on, never sprayed, whatever a film shows: nitrile gloves, safety glasses, ventilation on.
Say it
Words for today · 1 of 2
Key terms
- De-jig
- Removing the dried frame from the jig
- Dryness test
- Pressing the sample PVA blob — it shouldn't dent
- Progressive sanding
- Through grits 80 → 120 → 180 → 240
Words before content. Same word on the slide, the worksheet and out loud.
Say it
Words for today · 2 of 2
More key words
- Mask off
- Covering the areas you don't want painted
- Flash time
- The wait between coats while the paint dries
- Clear coat
- The transparent protective layer over the paint, brushed on (never sprayed)
Second half. Ask for each word back in their own words.
Show it
Today · you will
What will we do today?
- 1De-jig and test the bond
- 2Sand through the grits
- 3Mask, paint and clear coat

One idea per bullet. Say it, then show it.
Show it▶Protective clear coatWatch together · the next stage
Play from the laptop. Pause wherever hands go near the work.
Show it▶De-jig & testing the bondWatch together · the exact clip for today
Play from the laptop if the room has no internet. Ask the slide's question after.
Show it
De-jig, sand, paint
Sound, smooth, then coloured
- Dryness test the PVA blob; de-jig only after a full 24 hours; scrape drips with the back of the knife
- Sand lugs only (80→120); mask the bamboo
- Paint lugs thin; brush clear coat on everything

One idea per bullet. Say it, then show it.
You do · your evidence
De-jig, sand & paint
- Confirm dry; de-jig only after a full 24 hours (other tasks first if it is not yet 24 hours)
- Sand the lugs (80→120); mask the bamboo
- Paint lugs, clear coat; fix one defect before the final coat

Build itYour painted, clear-coated frame — bamboo natural — is today's evidence.
Offer to scribe at every written task. A scribed verbal answer is valid evidence.
Break
Break · 15 min
Back in the workshop after the count.
Say when the room restarts. Tools down, bench safe, then go.
Show it▶Painting the frameWatch together · the next stage
Play from the laptop. Pause wherever hands go near the work.
Show it▶Masking off & surface preparationWatch together · the next stage
Play from the laptop. Pause wherever hands go near the work.
Show me
Stop — record evidence
Hand these in
Day 8 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO6 (finishing), today.
Hard stop. Signing happens in the room. File before anyone leaves.

Show it
Wrap-up · next
What did we do today?
- De-jigged and inspected the frame
- Sanded through the grits
- Painted and clear-coated it
Next lesson: assembly and the final safety checks.
Mirror the objectives back. Two words of specific praise per learner.
Show it
Next session · looking ahead
Next lesson: Assembly & Final Safety Checks
- Fit wheels, handlebar, saddle
- Hand-start every bolt
- Pass the BBC Final Safety Inspection
Ten seconds. The point is that the next day has a shape.