Glue-Up Day
Build to Bond
Day 7 of 15 · The central build

Day 7
Glue-Up Day

PVA glue, one joint at a time — keep it clean and square

Recap · whole group
No hands needed · take your time
What do you remember from Day 6?
1What does Lug mean?
2What does Dry-fit mean?
3What does File mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day2 / 16
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
30 minPVA safety brief; jig
30 minV12 video + prepare joints
30 minPrepare PVA + load
90 minApply glue + seat
30 minCentre-line alignment check
30 minSign jig; sample blob
30 minWorkbook + post-glue check
30 minTool count, close
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day3 / 16
For the instructor

Videos today

  • 1Jig prep & preparing the joints 03a-jig-prep-degrease.mp4Today
  • 2Gluing the frame 03b-mixing-epoxy-glue-up.mp4Watch in order
  • 3Alignment & leaving to dry 03c-alignment-cure.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day4 / 16
Non-negotiable · every session

Safety first

  • Tool count at start and end — no exceptions
  • Nitrile gloves and safety glasses whenever PVA is applied; cut-resistant gloves (EN 388 Level D/5) for the abrading beforehand
  • Work in a well-ventilated area; PVA is water-based and low-hazard
  • Keep the PVA safety card visible at the glue station
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day5 / 16
Show it
Today · you will

What will we do today?

  • 1Apply PVA wood glue to each joint
  • 2Glue one joint fully before the next
  • 3Keep the frame on its centre-line
Bamboo tubes and hand tools laid over the balance-bike drawing
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day6 / 16
Show it▶Gluing the frameWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day7 / 16
Say it
Words for today · 1 of 2

Key terms

PVA wood glue
A water-based adhesive that bonds bamboo to the lug
Open time
Working time before PVA skins over (~10–15 min)
Keying
Cleaning and roughening so the glue grips
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day8 / 16
Say it
Words for today · 2 of 2

More key words

Squeeze-out
Excess glue that escapes the joint when seated
Centre-line
The line through all tubes — they must stay parallel
Dry time
The time PVA takes to set firm (24 hours)
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day9 / 16
Show it
PVA glue-up

One joint at a time

  • Key the joint, apply PVA; mind the open time (~10–15 min)
  • Glue Joint 1 fully
  • Keep all tubes on the centre-line; wipe squeeze-out while wet, with a dry cloth
Gloved hands bonding a bamboo joint
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day10 / 16
You do · your evidence

Glue your frame

  • Glue all three joints, one at a time
  • Wipe squeeze-out; leave it in the jig (fork + wheel) to cure for at least 24 hours before de-jigging
  • Sign your glue-up record
Gloved hands taping a bamboo tube
Build itYour signed glue-up record and a frame in the jig.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day11 / 16
Show it▶Jig prep & preparing the jointsWatch together · the exact clip for today
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day12 / 16
Show it▶Alignment & leaving to dryWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day13 / 16
Show me
Stop — record evidence

Hand these in

Day 7 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO1, LO2, LO4, today.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day14 / 16
What did we do today?
Show it
Wrap-up · next

What did we do today?

  • Applied PVA to every joint
  • Worked one joint at a time
  • Kept the frame square

Next lesson: de-jig, inspect, sand and paint.

Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 7 · Glue-Up Day15 / 16
Show it
Next session · looking ahead

Next lesson: De-Jig, Inspect, Sand & Paint

  • De-jig and test the bond
  • Sand through the grits
  • Mask, paint and clear coat
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 68–75Day 7 · Glue-Up Day16 / 16