Shaping, Fitting & Dry-Fit
Build to Bond
Day 6 of 15 · Build

Day 6
Shaping, Fitting & Dry-Fit Assembly

Shape the tubes, prep the surfaces, and dry-fit every joint

Recap · whole group
No hands needed · take your time
What do you remember from Day 5?
1What does Culm mean?
2What does Node mean?
3What does Wall thickness mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly2 / 16
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
15 minTool Count, Plan Layout & Bamboo
90 minFront Triangle: Mask, Score, Shave, Dry-Fit
75 minRear Stays: Same Cycle, Both Ends
45 minCross-Check 75mm + Wheel Alignment
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly3 / 16
For the instructor

Videos today

  • 1Front triangle — shaping & dry-fitting 01b-front-triangle-shaping-dryfit.mp4Today
  • 2Rear stays — shaping & fitting 02a-rear-stays-shaping-fitting.mp4Watch in order
  • 3Wheel alignment & cross-check 02b-wheel-alignment-crosscheck.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly4 / 16
Non-negotiable · every session

Safety first

  • Tool count at start and end — no exceptions
  • Glasses + FFP2 dust masks on for all shaping; dust extraction on
  • Files: clamp the bamboo — never shape it freehand; cut-resistant gloves (EN 388 Level D/5) for cutting, filing and sanding
  • Blade away from your body, every pass
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly5 / 16
Show it
Today · you will

What will we do today?

  • 1Shape the tubes to the lugs
  • 2Key and sand the bonding surfaces
  • 3Dry-fit all three joints
Filing a bamboo tube to the line
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly6 / 16
Say it
Words for today · 1 of 2

Key terms

Lug
The metal sleeve that joins two bamboo tubes
Dry-fit
Putting parts together without glue to check fit
File
A coarse tool for shaping bamboo
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly7 / 16
Say it
Words for today · 2 of 2

More key words

Bonding surface
The area the glue touches — clean and roughened
Keying
Roughening a surface so glue grips
Approval gate
A mandatory checkpoint before you can proceed
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly8 / 16
Show it
Shape, key, dry-fit

Easy fit, not tight

  • **easy fit, not tight**
  • Dry-fit, mark high spots, file back, re-fit — repeat until it slides in
  • Wheel centred in the dropouts; pass the gate (seated, gap <1 mm, no twist)
Marking a bamboo tube before cutting
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly9 / 16
Show it▶Wheel alignment & cross-checkWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly10 / 16
You do · your evidence

Shape, key & dry-fit

  • Shape all three tubes
  • Key every bonding surface
  • Pass the dry-fit gate
Part-built bamboo balance bike on a workbench over the frame drawing
Build itYour dry-fitted frame, signed off at the gate, is your evidence for today.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly11 / 16
Show it▶Front triangle — shaping & dry-fittingWatch together · the exact clip for today
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly12 / 16
Show it▶Rear stays — shaping & fittingWatch together · the next stage
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly13 / 16
Show me
Stop — record evidence

Hand these in

Day 6 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO2–LO3, today.
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly14 / 16
What did we do today?
Show it
Wrap-up · next

What did we do today?

  • Shaped every tube to its lug
  • Keyed the bonding surfaces
  • Passed the dry-fit gate

Next lesson: glue-up day.

Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 50–59Day 6 · Shaping, Fitting & Dry-Fit Assembly15 / 16
Show it
Next session · looking ahead

Next lesson: Glue-Up Day

  • Apply PVA wood glue to each joint
  • Glue one joint fully before the next
  • Keep the frame on its centre-line
Bamboo Bicycle ClubBuild to BondWorkbook 1 · pp 60–67Day 6 · Shaping, Fitting & Dry-Fit Assembly16 / 16