De-Jig & Structural Inspection
Build to Bond · Balance Bike
Day 6 of 10 · Quality

Day 6
De-Jig & Structural Inspection

Free the cured frame and prove every joint is sound

Recap · whole group
No hands needed · take your time
What do you remember from Day 5?
1What does Construction jig mean?
2What does Pot life mean?
3What does Degrease mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection2 / 14
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
30 minCure test on sample blob; tool
90 minDe-jig under supervision; initial visual inspection
75 minDetailed structural inspection per learner
30 minRemediation plan if defects found
15 minWorkbook entries + close
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection3 / 14
For the instructor

Videos today

  • 1De-jig & testing the cured bond 04a-dejig-test-bond.mp4Today
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection4 / 14
Non-negotiable · every session

Safety first

  • Tool count at start and end — no exceptions
  • Glasses on during de-jig — stored tension can release
  • Gloves on for handling — residual epoxy
  • De-jig only after a full 24 hours — no forcing; if it won't release, stop and check
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection5 / 14
Show it
Today · you will

What will we do today?

  • 1After 24 hours, cure-test the sample blob
  • 2De-jig the frame gently
  • 3Inspect and record every joint
Bamboo tubes and hand tools laid over the balance-bike drawing
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection6 / 14
Say it
Words for today · 1 of 2

Key terms

Cure
Full hardness of the epoxy after at least 24 hours
De-jig
Removing the cured frame from the jig
Sample blob
A blob of epoxy left on the bench on Day 5, used to test cure
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection7 / 14
Say it
Words for today · 2 of 2

More key words

Defect
Any flaw — crack, gap or misalignment
Remediation
The plan to fix a defect
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection8 / 14
Show it
Day 6 · test & inspect

Hard, then sound

  • After a full 24 hours, press the sample blob
  • De-jig gently — no forcing
  • Pass each joint: seated, no cracks, square, no movement, clean squeeze-out
Gloved hands taping a bamboo tube
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection9 / 14
Show it▶De-jig & testing the cured bondWatch together · the exact clip for today
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection10 / 14
You do · your evidence

De-jig & inspect

  • Confirm 24 hours and cure, then de-jig
  • Inspect and record every joint
  • Note any defect + plan
Finished bamboo balance bike seen from above on a white wall
Build itYour completed joint-inspection record is your evidence for today.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection11 / 14
Show me
Stop — record evidence

Hand these in

Day 6 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO4, today.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection12 / 14
What did we do today?
Show it
Wrap-up · next

What did we do today?

  • Confirmed the epoxy had cured
  • De-jigged without damage
  • Inspected and recorded every joint

Next lesson: sanding and surface prep.

Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection13 / 14
Show it
Next session · looking ahead

Next lesson: Sanding & Surface Prep

  • Knock back the epoxy drips
  • Sand through progressive grits
  • Leave a clean surface for paint
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 6 · De-Jig & Structural Inspection14 / 14