
Build to Bond · Balance Bike
Day 5 of 10 · The irreversible dayDay 5
Epoxy Bonding
Position, bond and align — three tubes, then leave it to cure
Welcome the room. Say the day's shape in one sentence.
Recap · whole group
No hands needed · take your time
What do you remember from Day 4?
1What does Stays mean?
2What does 75 mm cross-check mean?
3What does Wheel alignment mean?
Say itAnswer out loud. Any answer is a start.
Ask, then count ten before taking an answer. Take offers, never cold call.
How today runs
Run of day
Every step is one of four→Show it→Build it→Say it→Show me
20 minPre-flight check — confirm all pre-bond
20 minSet up construction jig
20 minSurface preparation
60 minEpoxy dispensed + bond
60 minBond
30 minBond
30 minCentre-line alignment check + jig sign-off
Read the shape of the day out loud once. Say when the break falls.
For the instructor
Videos today
- 1Mixing & gluing the frame 03b-mixing-epoxy-glue-up.mp4Today
- 2Alignment & leaving to cure 03c-alignment-cure.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Check every file is on the laptop before the session. Subtitles are on.
Non-negotiable · every session
Safety first
- Tool count at start and end — no exceptions
- Your instructor dispenses the epoxy. You never handle the resin or hardener
- Nitrile gloves (changed between joints), safety glasses and long-sleeved overalls; ventilation on; position the joint within 2–5 minutes
- Frame in the jig: do not touch for 24 hours
Read every rule aloud. Same list as the session risk assessment. The instructor dispensing the epoxy wears chemical-resistant gloves (Cat III, EN 374), an EN 166 face shield and overalls.
If something goes wrong
Eyes, skin, spills, fire
- Epoxy in your eyes: eye wash for at least 15 minutes, then medical help
- Epoxy on skin: wash with soap and water now; tell your instructor
- Spill: keep clear — your instructor deals with it
- Fire or alarm: stop work, go to the muster point
Read every rule aloud. Point to the eye wash, the first aid kit, the fire exits and the muster point.
Show it
Today · you will
What will we do today?
- 1Abrade and wipe every joint (FFP2 dust mask, safety glasses and cut-resistant gloves, EN 388 Level D/5)
- 2Position the epoxy joint (your instructor dispenses it)
- 3Seat, align and leave it to cure

One idea per bullet. Say it, then show it.
Say it
Words for today · 1 of 2
Key terms
- Construction jig
- Fork + front wheel — the frame stands up on it during glue-up
- Pot life
- Working time once your instructor has dispensed the epoxy (~30 min)
- Degrease
- Remove oil and dust: abrade, then wipe with a dry cloth. No solvents
Words before content. Same word on the slide, the worksheet and out loud.
Say it
Words for today · 2 of 2
More key words
- Squeeze-out
- Excess glue around a joint as the tube seats
- Cure
- Time epoxy takes to harden: leave it at least 24 hours before de-jigging
- Bonding log
- Per-tube sign-off: down tube, stay 1, stay 2
Second half. Ask for each word back in their own words.
Show it
Day 5 · clean, position, bond
Seat & align
- Your instructor dispenses the epoxy — you position the joint within 2–5 minutes, wearing nitrile gloves
- Glue both surfaces (lug + bamboo); push and rotate as each tube seats
- Bond tube then stays; wipe squeeze-out, re-check alignment

One idea per bullet. Say it, then show it.
Show it▶Mixing & gluing the frameWatch together · the exact clip for today
Play from the laptop if the room has no internet. Ask the slide's question after. Whatever the film shows, the instructor dispenses the epoxy and learners never mix it.
Show it▶Alignment & leaving to cureWatch together · the next stage
Play from the laptop. Pause wherever hands go near the work.
You do · your evidence
Bond your frame
- Abrade, wipe and bond all three tubes
- Wipe squeeze-out, align in the jig
- Sign your bonding log per joint

Build itYour evidence: the signed bonding log and a frame curing in the jig.
Offer to scribe at every written task. A scribed verbal answer is valid evidence.
Show it▶How to Glue a Bamboo Balance Bike Frame with Epoxy (Part 3)Watch for: the exact step you are about to do
The lesson page's own build film. No internet in the room — play from the laptop. Whatever the film shows, the instructor dispenses the epoxy and learners never mix it.
Show me
Stop — record evidence
Hand these in
Day 5 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO3, LO4, today.
Hard stop. Signing happens in the room. File before anyone leaves.

Show it
Wrap-up · next
What did we do today?
- Prepared and bonded every joint
- Aligned the frame in the jig
- Logged each bond
Next lesson: de-jig and inspect the cured frame.
Mirror the objectives back. Two words of specific praise per learner.
Show it
Next session · looking ahead
Next lesson: De-Jig & Structural Inspection
- Wait a full 24 hours, then cure-test the sample blob
- De-jig the frame gently
- Inspect and record every joint
Ten seconds. The point is that the next day has a shape.