Epoxy Bonding
Build to Bond · Balance Bike
Day 5 of 10 · The irreversible day

Day 5
Epoxy Bonding

Position, bond and align — three tubes, then leave it to cure

Recap · whole group
No hands needed · take your time
What do you remember from Day 4?
1What does Stays mean?
2What does 75 mm cross-check mean?
3What does Wheel alignment mean?
Say itAnswer out loud. Any answer is a start.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding2 / 17
How today runs

Run of day

Every step is one of four→Show it→Build it→Say it→Show me
20 minPre-flight check — confirm all pre-bond
20 minSet up construction jig
20 minSurface preparation
60 minEpoxy dispensed + bond
60 minBond
30 minBond
30 minCentre-line alignment check + jig sign-off
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding3 / 17
For the instructor

Videos today

  • 1Mixing & gluing the frame 03b-mixing-epoxy-glue-up.mp4Today
  • 2Alignment & leaving to cure 03c-alignment-cure.mp4Watch in order
⚠No internet in the room. Play from the laptop, and open each file before the session to check the sound. Subtitles are on.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding4 / 17
Non-negotiable · every session

Safety first

  • Tool count at start and end — no exceptions
  • Your instructor dispenses the epoxy. You never handle the resin or hardener
  • Nitrile gloves (changed between joints), safety glasses and long-sleeved overalls; ventilation on; position the joint within 2–5 minutes
  • Frame in the jig: do not touch for 24 hours
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding5 / 17
If something goes wrong

Eyes, skin, spills, fire

  • Epoxy in your eyes: eye wash for at least 15 minutes, then medical help
  • Epoxy on skin: wash with soap and water now; tell your instructor
  • Spill: keep clear — your instructor deals with it
  • Fire or alarm: stop work, go to the muster point
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding6 / 17
Show it
Today · you will

What will we do today?

  • 1Abrade and wipe every joint (FFP2 dust mask, safety glasses and cut-resistant gloves, EN 388 Level D/5)
  • 2Position the epoxy joint (your instructor dispenses it)
  • 3Seat, align and leave it to cure
Bamboo tubes and hand tools laid over the balance-bike drawing
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding7 / 17
Say it
Words for today · 1 of 2

Key terms

Construction jig
Fork + front wheel — the frame stands up on it during glue-up
Pot life
Working time once your instructor has dispensed the epoxy (~30 min)
Degrease
Remove oil and dust: abrade, then wipe with a dry cloth. No solvents
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding8 / 17
Say it
Words for today · 2 of 2

More key words

Squeeze-out
Excess glue around a joint as the tube seats
Cure
Time epoxy takes to harden: leave it at least 24 hours before de-jigging
Bonding log
Per-tube sign-off: down tube, stay 1, stay 2
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding9 / 17
Show it
Day 5 · clean, position, bond

Seat & align

  • Your instructor dispenses the epoxy — you position the joint within 2–5 minutes, wearing nitrile gloves
  • Glue both surfaces (lug + bamboo); push and rotate as each tube seats
  • Bond tube then stays; wipe squeeze-out, re-check alignment
Gloved hands bonding a bamboo joint with epoxy
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding10 / 17
Show it▶Mixing & gluing the frameWatch together · the exact clip for today
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding11 / 17
Show it▶Alignment & leaving to cureWatch together · the next stage
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding12 / 17
You do · your evidence

Bond your frame

  • Abrade, wipe and bond all three tubes
  • Wipe squeeze-out, align in the jig
  • Sign your bonding log per joint
Gloved hands taping a bamboo tube
Build itYour evidence: the signed bonding log and a frame curing in the jig.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding13 / 17
Show it▶How to Glue a Bamboo Balance Bike Frame with Epoxy (Part 3)Watch for: the exact step you are about to do
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding14 / 17
Show me
Stop — record evidence

Hand these in

Day 5 evidence
Workbook entry, signed in the room. Signed by you and your tutor.
Verbal answers
Say it and the tutor scribes — that counts.
Goes in your OCN portfolio — LO3, LO4, today.
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding15 / 17
What did we do today?
Show it
Wrap-up · next

What did we do today?

  • Prepared and bonded every joint
  • Aligned the frame in the jig
  • Logged each bond

Next lesson: de-jig and inspect the cured frame.

Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding16 / 17
Show it
Next session · looking ahead

Next lesson: De-Jig & Structural Inspection

  • Wait a full 24 hours, then cure-test the sample blob
  • De-jig the frame gently
  • Inspect and record every joint
Bamboo Bicycle ClubBuild to Bond · Balance BikeB2B10 WorkbookDay 5 · Epoxy Bonding17 / 17